Complete extensive demolition works, strip-out and refurbishment at ground, first floor & roof level. The works included demolition of walls, original services and strip out on each level. Works also included the demolition of an existing internal concrete stairwell and the installation of a new feature steel staircase. All windows and external doors were removed and replaced with new. A curtain wall glazing system was also installed on the South West elevation.
The existing plant room on the roof underwent complete refurbishment and the entire roof was re-weathered. Internal finishing included stud partitions, dry lined/skim walls, suspended ceilings, raised access floors, glazed screens, paintwork, joinery, M&E & sanitary ware.