Tyndall Information Technology & Research Centre

  • Tyndall Information Technology & Research Centre

Description

The works consisted of the strip out and refurbishment of 3,000sqm of existing space which includes 660sqm of laboratory refurbishment within the 3 storey Maltings Building (Block B) (a protected structure) along with an extension at each level to enhance circulation within the building.

Works included initial demolition of internal partitions, wall finishes, floor finishes, ceiling finishes and mechanical and electrical works. An element of mechanical and electrical demolitions on the roof area was also carried out. The refurbishment consisted of new wall, floor and ceiling finishes along with a new mechanical and electrical installation.

Works completed on a phased basis with areas remaining live (kitchen, canteen and toilet areas on the ground floor, laboratories on the 2nd floor).

Share: